Holy Gardens Calamba City, PHL | November 16, 2013.
Our solar panel installation at Holy Gardens Calamba City was finally installed yesterday by the AVG power system after months of waiting. Reason, the rules of importation of solar panels was changed, there were hullabaloo at the BOC about rotation of collectors and the restraining orders. We made the downpayment since August to the contractor/importer and we were very much worried. We have developed other suppliers though
Our installation there is 3 kWp and is to save us about P3,000 a month in electrical power consumption
We intend to have it as show case and a model for installation of renewable cheap energy source for the rest of the HolyGardens Group